Print version

Projects

Data on the basic projects executed by OAO NPO Promavtomatika or being in the process of realization

The name of the projectThe state of the projectThe customer
Information-computer system (ICS) of deethanized condensate mass control unit ICS is applied in 1999 at Urengoi gas condensate treatment plant OOO Gazprom Dobycha Urengoi
Complex automated system of distribution and dosing of hydrate formation inhibitor for complex gas treatment plant 1AB in Urengoi oil and gas condensate deposit (NGKM) Put into commercial operation in 2008
Process automated control system for complex gas treatment plant 7 in  Urengoi gas condensate deposit At the stage of putting into commercial operation
Process automated control system of complex gas treatment plant 1B (2nd turn) for Yamburg deposit Put into commercial operation in 1999 OOO Gazprom Dobycha Yamburg
Process automated control system of preliminary gas treatment plant 2B in Yamburg deposit Put into commercial operation in 2001
Process automated control system for preliminary gas treatment plant 4A in Aneryakhinsk area of Yamburg deposit Put into commercial operation in 2006
Process automated control system of gas enterprise 9 in Kharvutinsk area of Yamburg deposit (1st start complex) Put into commercial operation in 2007
Process automated control system of preliminary gas treatment plant 8 in Yamburg deposit Execution of techno-constructor’s design in 2008
Process automated control system of preliminary gas treatment plant 10 in Kharvutinsk area of Yamburg deposit Put into commercial operation in 2008
Power supply automated control system for water intake facility  in Kharvutinsk area of Yamburg deposit Put into commercial operation in 2008
Power supply automated control sytem for industrial base (Prombaza) in Kharvutinsk area  of Yamburg deposit Put into commercial operation in 2009
Gas production process automated control system in Kharvutinsk area of Yamburg deposit Put into commercial operation in 2009
Process automated control system for gas process plant 9 in Kharvutinsk area of Yamburg deposit Put into commercial operation in 2009
Process automated control system for complex gas treatment plant 1 in Yamburg deposit Constructor’s design is executed in 2008
Power supply  automated control system for gas plant 9 (1st start complex) in Kharvutinsk area of Yamburg deposit Put into commercial operation in 2007
Power supply automated control system  for preliminary gas treatment plant 10 in Kharvutinsk area of Yamburg deposit Put into commercial operation in 2008
Power supply automated control system for gas process plant 9 in Kharvutinsk area of Yamburg deposi Put into commercial operation in 2009
Information managing system for Yuzhno-Russkoye oil and gas deposit (start complex) Put into operation in 2007 OAO Severneftegazprom
Information managing system for Yuzhno-Russkoye oil and gas deposit (expansion) Techno-constructor’s design is executed in 2007.
Put into trial operation in 2008
Process automated control system   for booster shop 1 in Yuzhno-Russkoye oil and gas  deposit Techno-constructor's design is executed in 2008. Execution of factory testing
Information managing system for Beregovoye deposit Put into commercial operation in 2003 OAO Sibneftegaz
Power supply automated control system for CS Krasnodarskaya GM Blue Stream Put into commercial operation in 2004 OAO Kubangazprom
Process automated control system of brewery boilers Baltika in Samara and Khabarovsk Put into commercial operation in 2004 OOO Baltika
Power supply automated control system for CS Stavropolskaya NG Blue Stream Put into commercial operation in 2006 OOO Gazprom Transgaz Stavropol
Power supply automated control system for CS Purtazovskaya NG Zapolyarnoe-Urengoi (three workshops) The 1st turn is put into commercial operation in 2002
The 2nd turn is put into commercial operation in 2004
The 3rd turn is put into commercial operation in 2005
OOO Gazprom Transgaz Surgut
Power supply automated control system for CS Zhirnovskaya Put into commercial operation in 2007 OOO Gazprom Transgaz Volgograd
Power supply automated system of efficient dispatch supervision (1st turn) Put into commercial operation in 2007 OAO Voronezhsintezkauchuk
Power supply automated system of efficient dispatch supervision (2nd turn) Put into commercial operation in 2008
Process automated control system of complex gas treatment plant for Bratsk gas condensate deposit Techno-constructor’s design is executed; pre-commissioning is in process OOO NGK ITERA
Process automated control system for oil production  in Zhuravski oil deposit Techno-constructor’s design is executed in 2007. The jobs have been stopped by the investor's decision
Process information automated control system for OOO NK Severneft Design-normative works are in process OOO NK Severneft
Power supply automated control system for CS Kamensk-Shakhtinskaya Techno-constructor's design is executed, PTC is executed, design-normative works are in process OOO Gazprom Transgaz Kuban
Process automated control system for elevator "AMUR" Techno-constructor’s design is executed in 2007 FGI industrial complex "AMUR"
Process automated control system for complex gas treatment plant in Pyreiny gas condensate deposit Put into commercial operation in 2009 OAO Sibheftegaz
Process automated control system for ammonia storage section in SMU OOO EvroXim-BMU shop, Belorechensk Techno-constructor’s design is executed in 2007.
Put into operation test in 2008
OOO EvroXim-Minudobreniya
Power supply automated control system for CS Lukoyanovskaya Techno-constructor's design is executed OOO Gazprom Transgaz Nizhniy Novgorod
Power supply automated control system  for CS Ivanovskaya Techno-constructor's design is executed
Power supply automated control system  for CS Novoarzamasskaya Techno -constructor's design is executed, PTC is executed, design-normative works are in process

 

 
 
 
Print version